Sewage Treatment

At O'Brien Water Services we are approved distributors of Tricel Wastewater Systems. Tricel is recognized as one of the market leaders in the treatment of wastewater in Ireland. The Tricel is a relatively trouble free system with no moving parts in the actual tank itself.

 

The Waste Water Treatment Process.
1. Primary Settlement 2. Aeration 3. Final Settlement.


Stage 1.
Stage1 takes place in the primary settlement chamber where the wastewater is introduced. The solids drop to the bottom and are separated from the liquid. Anaerobic breakdown now begins to occur and improves the water quality.
Stage 2.
Stage 2 takes place in the aeration chamber where masses of naturally occurring bacteria inhabit specially designed filter media. These bacteria are sustained with air, which is continuously supplied from a purpose built pump in the top section of the unit. As the liquid flows through the filter media the bacteria feed on the impurities, consuming them, thus removing them from the liquid.
Stage 3.
The liquid now flows from the aeration chamber to the final settlement chamber. Small quantities of bacteria known as sludge are carried with the liquid at this stage. This sludge settles towards the bottom of the final settlement chamber where a continuous sludge return system pumps back to chamber 1. The remaining treated liquid now meets the required standard to be safely passed out of the treatment system.

Achieving European Standard EN12566-3
The Tricel® Sewage Treatment Systems have successfully passed these tests and is now approved to the New European standard EN 12566-3 Small wastewater treatment systems for up to 50 PT-Part 3: Packaged and/or site assembled domestic wastewater treatment plants.
The Tricel® system was placed through a rigorous 38-week test, by the certifier laboratory PIA GmbH-Testing Institute for Wastewater Technology in Aachen, Germany. The Biological tests carried out in Aachen on the Tricel® system provides us the knowledge that our product is still the best in the business with a treatment efficiency of 95.7% for BOD5 and 95.4% for S:S. Structural testing (leak test, crush test & durability test) was carried out by PIA staff at our headquarters in Killarney and the range of tanks up to P50 successfully passed all of the required tests.

DESIGN POPULATION

P6

P9

P12

P18

Treatment Capacity

litres

4000

4000

5516

7136

Primary Settlement Zone

litres

1931

1400

2113

2889

Secondary Treatment Zone

litres

1188

1575

2134

2372

Final Settlement Zone

litres

881

1025

1269

1875

Nominal Inlet/Outlet pipe diameter

mm

110

110

110

110

Overall Length

mm

2600

2600

3600

4600

Overall Width

mm

1640

1640

1640

1640

Overall Height

mm

2230

2230

2230

2230

Weight Empty*

kg

300

300

400

500

Design Flow Rate

litres/day

1200

1800

2400

3600

BOD Load

kg/day

0.36

0.54

0.72

1.08

Inlet invert to base

mm

1375

1375

1375

1375

Outlet invert to base

mm

1300

1300

1300

1300

Inlet Invert to Ground Level

mm

545

545

545

545

Outlet invert to Ground level

mm

620

620

620

620

Air Blower rating (mean)

watts

60

100

100

100 (x2)

Thickness (minimum)

mm

5

5

5

5

Retention Time

hours

78.3

52.2

55.4

47.8

*allow an extra 100kgs for lifting purposes